    Phelan Energy group

    Manager-Quality, Site, Supplier Quality

    Supplier Quality: 1. Carry out supplier validation audits, with supplier support and MQAP 2. Work with Engineering (Design and Manufacturing Engineers) team to define process parameters and criteria to ensure supplier process capability is effective to meet product and process requirements. 3. Facilitate root cause analysis and corrective actions of supplier quality issues. 4. Follow up the Factory Inspections with TPI and Supplier. 5. Review and verify the FAT reports and approval process for material dispatch. Quality Control and Quality Assurance: 1. Developing and leading the project’s adherence to the Quality Management Plan requirements. 2. Preparation of the Project Quality Plans, Quality Control Plans and Project Quality Procedures which guarantee compliance with contractual requirements and IEC/IS/EN Standards 3. Supervises inspections, reports and the documentation issued by inspectors and collect and file the required Quality Records. 4. Planning duties within the QA/QC staff and related work schedules Prepare daily QA/QC report regarding inspection, materials and nonconformance etc. 5. Responsible for Review and approve quality documentation 6. Carry out all other tasks required by Site Construction Manager or Project Manager 7. Present quality issues / failings at scheduled meetings to improve quality performance at the site. 8. Plan and perform audits to check implementation compliance Monitor quality control on construction progress activitiesSite Manager: 1. Responsible for execution of the project in the required form as stated in this plan. 2. Responsible for provision of the necessary resources, facilities, competencies, instructions, and leadership. 3.Surveillance and monitoring the performance of programmed personnel and activities. 4.Establish site infrastructure. 5.Control Site logistics, material handling and storage. 6.Manage sub-contractors at site and coordinate with consortium partners. 8.Control costs, time schedule & critical activities. 9.Planning, execution & monitoring of the project deliverables. 10.Monitoring Progress and performance on site. 11.Supports QA/QC manager in providing essential resources for improving quality standard.

  • 2017 - 2017
    SOLARPACK INDIA LLP

    QEHS Manager

    QA/QC Documentation and review contractor construction Civil & Electrical Procedures Supervise and monitoring of Civil, Mechanical and Electrical installation activities of EPC team. Witness the routine inspection and document results in accordance with approved procedure Prepare daily QA/QC report regarding inspection, materials and nonconformance etc. Ensure that all works will execute as per drawings and ensure all equipment used at site are calibrated and with valid certificates Monitor quality control on construction progress activities Responsible from equipment installation and continue energizing of electrical equipment to precommissioning and commissioning Review tested documentation, witness and accept all required tests of EPC team. Review the root cause analysis for Civil, Mechanical and Electrical activities. To check the drawings provided by various design consultants and integrate in the project. Conversant with IEC / EN / IS specification. Preparation of the Project Quality Plans, Quality Control Plans and Project Quality Procedures which guarantee compliance with contractual requirements and ISO Standards Monitoring that proper quality standards are maintained at sites. Compliance to applicable manufacturing codes and Implementation of Field quality assurance plans. Implementing QMS Monitoring the site activities to avoid non-conformances regarding quality

  • 2016 - 2017
    KEC INTERNATIONAL LIMITED

    SENIOR ENGINEER-QUALITY

    QA/QC Documentation and review contractor construction Civil & Electrical Procedures Supervise and monitoring of Civil, Mechanical and Electrical installation activities. Perform routine inspection and document results in accordance with approved procedure Prepare daily QA/QC report regarding inspection, materials and nonconformance etc. Ensure that all works will execute as per drawings and ensure all equipment used at site are calibrated and with valid certificates Monitor quality control on construction progress activities Responsible from equipment installation and continue energizing of electrical equipment to precommissioning and commissioning Review tested documentation, witness, and accept all required testing for Client

  • 2015 - 2016
    GAMESA RENEWABLES PVT LTD

    SENIOR ENGINEER

    Construction Monitoring: 1.Review, inspect and monitor quality assurance (QA) procedures of 220 KV Transmission line and 220/33 KV Pooling Substation. 2.Monitoring day to day progress for the project & reporting to client. Monitoring erection works like Pole, CT, PT, VCB, Panels, Bus works, stringing works of substation. 3.Inspection and project monitoring of 220/33 KV pooling substation and 220 KV Transmission line. Projects Undertaken: 320MW 220/33KV Substation at Nimbagallu, Anantapur, India Commissioned on 30th March 2016. 4.Larsen & Toubro – Sergent & Lundy Limited, Vadodara: Working as a Site engineer (Electrical) on deputation in Wind Farm of 200 MW Project (Orange Maha Wind Energy Pvt. Ltd.) at Khanapur, Maharashtra. Scope of Work: Handling Survey, construction Monitoring and Quality and safety control for 220/33 KV pooling Substations, 220 KV Transmission line and 33KV DP yards as per company Technical Specifications and Quality Specifications. Project Schedule & Reporting 1.Preparation of L1& L2 Schedule. 2.Major & Minor milestone identification. 3.Identification of Potential risk & mitigation in Project schedule. 4.Daily activity track reports from site with key photographs during execution. 5.Detailed weekly reports including check on resources and inventory. Construction Monitoring 1.Review, inspect and monitor quality assurance (QA) procedures of the 33 KV DPyards, 220 KV Transmission line and 220/33 KV Pooling Substation. 2.Monitoring day to day progress for the project & reporting to client. 3.Monitoring erection works like Pole, CT, PT, VCB, Panels, Bus works, stringing works of substation. 4.Inspection and project monitoring of 220/33 KV pooling substation,33 KV DP yards,33 KV internal and external Lines and 220 KV Transmission line.

  • 2014 - 2015
    L& T- S&L Limited

    SENIOR ENGINEER

    Scope of Work: Handling Survey, construction Monitoring and Quality and safety control for 220/33 KV pooling Substations, 220 KV Transmission line and 33KV DP yards as per company Technical Specifications and Quality Specifications. Project Schedule & Reporting 1.Preparation of L1& L2 Schedule. 2.Major & Minor milestone identification. 3.Identification of Potential risk & mitigation in Project schedule. 4.Daily activity track reports from site with key photographs during execution. 5.Detailed weekly reports including check on resources and inventory. Construction Monitoring 1.Review, inspect and monitor quality assurance (QA) procedures of the 33 KV DPyards, 220 KV Transmission line and 220/33 KV Pooling Substation. 2.Monitoring day to day progress for the project & reporting to client. 3.Monitoring erection works like Pole, CT, PT, VCB, Panels, Bus works, stringing works of substation. 4.Inspection and project monitoring of 220/33 KV pooling substation,33 KV DP yards,33 KV internal and external Lines and 220 KV Transmission line.

  • 2013 - 2014
    HATCH POWER INFRA PVT. LTD

    Site Incharge

    33/132 KV pooling Substation and connected 33 KV Double circuit EHV line from Tagguparthi to Raketla(15KM) constructed in Anantapur District (A.P) under Gamesa. 33/132 KV pooling Substation and connected 33 KV Double circuit EHV line 20KM constructed in Sholapur District (M.H) under Gamesa. Handover &Takeover activities with documentation Proper work planning on location activities and communicate with higher & lower levels. Work knowledge on Switchyard (HT & LT) 690Volts/33KVWork closely with contractors and lead a team. Responsible of Inspect all incoming materials and prepare NCR for non-conformity materials. Material handling, equipment planning as per site requirement. Participate with internal and external audit. Evaluating health & safety issues and formulating practical solutions and ensuring the highest level of safety standards is applied by all Consultants. Preparing that all required inspection and testing records are progressively and systematically generated and compiled for hand-over to Clients as per ISO Standard. Worked fully in accordance with the project quality standards specified in the Contract and that the procedures laid down in the Project Quality Procedure and work instruction to achieve these standards are followed

  • 2010 - 2013
    COBRA INSTALLATIONES Y SERVICIOS SA

    Planning Engineer

    Supply, erection, testing and commissioning of 33/11 KV Substation, 33 KV Line and Cable Termination works. As per our client Technical Specifications and Quality Procedure. Key Roles: Survey & Construction & Commissioning of 33/11KV Substations and 33 KV & 11 HV Lines.33/11KV Substations and connected 33 KV & 11 KV Double & Single circuit HV lines constructed in Nasik District (MH) under MSEDCL. Handover &Takeover activities with documentation. Proper work planning on location activities and communicate with higher & lower levels. Work knowledge on 132/33 kV Substations, 33/11KV Substations and 33KV lines, Monitor scope, quality, budget, schedules, productivity, and work in progress to ensure project plans are effectively being implemented. Attending progress review meetings and preparing reports highlighting status of critical activities problem areas, and constraints on achieving planned progress, schedule impacts, critical issues, and action plans. Material handling, equipment planning as per site requirement. Coordinate with Engineering team, TSG. Participate with internal and external audit. Liaising with MSEDCL officials for drawing approvals, GTP and DI to the project. Preparation of progress reports and qty schedules and invoicing. Reconciliation of client supplied materials and contract materials Preparing that all required inspection and testing records are progressively and systematically generated and compiled for hand-over to Clients as per ISO Standard. Worked fully in accordance with the project quality standards specified in the Contract and that the procedures laid down in the Project Quality Procedure and work instruction to achieve these standards are followed.

  • 2008 - 2010
    ASTER PVT LTD

    Project Coordinator

    Scope of Work: Supply, erection, testing and commissioning of 33/11 KV Substation, 33 KV Line and Cable Termination works. As per our client Technical Specifications and Quality Procedure. Responsibilities: Contour Survey of Substation Line Survey, pole Erection and stringing (450 KM)Structure and Equipment Erection (CT, PT, ISOLATOR, LA, CB, CAPACITOR BANK) Cable Laying and Termination (POWER CABLE AND CONTROL CABLE) Control Panel Erection (TRANSFORMER AND FEEDER PROTECTION PANELS) HT (XLPE) Cable Termination (XLPE TERMINATIONS) Earth Mat Laying Cable scheduling and commissioning